Quick Links

Top Header Social Icons

Delivering World-Class Solutions

Cummins Energy Solutions Nigeria (CESN) is the official Cummins Nigeria gas generator distributor and after sales support.  We install & commission gas fired turnkey power plants, offer world-class operations & maintenance and aftermarket support and run an in house Projects team that drives energy efficiency throughout customer facilities using innovative technologies such as waste heat recovery and distribution upgrades.  

CESN has the highest population of gas generators installed in Nigeria and was the pioneer in the development of the gas to power industry.  Operating on natural gas has significant economic and environmental benefits.  Nigeria is also Cummins’ second largest gas market worldwide – the generators are well suited to ‘off grid’ applications as Cummins sets can handle transient load capabilities of up to 40%, compared to the industry norm of 10%. 

Our service capability is what sets us apart.  With the most comprehensive Service and Aftermarket Gas Generator Team in Nigeria, Cummins is able to pre-empt generator problems using innovative technology such as remote monitoring and respond instantaneously to any site issues. 

CESN works closely with Powergas Africa, Africa’s leading Compressed Natural Gas (CNG) producer & distributor, to deliver natural gas to clients not connected to the pipeline.  Powergas is also currently constructing one of West Africa’s first mini-LNG facilities.  Our close partnership and respective proven track records enable us to truly deliver reliable and cost effective power.  For more information visit www.powergas.com 

Our mission is to offer a better quality power solution at a lower cost for all our customers. 

Feasibility & Load StudyEngineering and DesignInstallation & TestingOperation & Maintenance

Concept to Commissioning

  1. Project feasibility analysis & load study 
  2. Project engineering & design 
  3. Installation, testing & commissioning 
  4. Service & maintenance

CESN customizes energy saving solutions for each individual customer – taking into account all factors from budget, space, load profile, power distribution & evacuation, steam & cooling requirement etc. 

With in-house engineering and project management capabilities, you have a single point of contact with Cummins for all generator installations.  Furthermore, all customers are assigned a project manager, who has comprehensive knowledge of Cummins power generating equipment, and responsible for coordinating all project activity and delivering a high quality installation on time.

Key Achievements in Nigeria

  • Over 200 Cummins gas generator sets installed in Nigeria, delivering over 270 MWe of power across Nigeria
  • Best service support in Nigeria – 99% power availability across all Cummins operated & serviced plants
  • Installed gas generators across a wide variety of industries – FMCG, bottling, breweries, plastics, steel, residential estates, office building etc.
  • Up to 100% reduction in customer power costs
  • 100% safety record at all customer sites
  • Leading multinational customers across Nigeria

Health, Safety and Environment

CESN runs a full scale Health, Safety and Environment (HSE) department to ensure site and employee health, safety and welfare.  Safety is a core value.

Proactive safety measures are employed in initial site surveys, pre-installation risk assessments, contractor pre-qualifications and site safety briefings – all with a view of ensuring safe project delivery.  Prior to project commissioning, an operational risk assessment is conducted to ensure any foreseeable operational risks are controlled, if not eliminated.

As a team, we believe in the “See it, Own it“ philosophy of hazard management, and actively identify hazards since proper preventive actions give rise to an interdependent safety culture.

Contact CESN